Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Ferry is out of service at Barnston Island Ferry. Until Sun May 4. Ferry route closed. Foot passenger service only times. Ferry out of service each night: April 28-May 1 from 9:00PM to 11:55PM, May 2 9:00PM to 12:55AM and May 3 - May 4 from 2:00PM to 10:00PM. Next update time Sun May 4 at 10:00 PM PDT. Last updated Thu Apr 24 at 2:49 PM PDT. (DBC-75727) |
Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Delays expected for GVW over 4,600kg at low water levels. Contact ferry operator to plan travel accordingly. Next update time Tue Apr 29 at 3:00 PM PDT. Last updated Sat Apr 26 at 3:19 PM PDT. (DBC-73930) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Vehicle incident between Riverside Rd and Exit 92 (Abbotsford). Roadway reduced to one lane. Next update time Mon Apr 28 at 4:30 AM PDT. Last updated Mon Apr 28 at 1:13 AM PDT. (DBC-75868) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri May 2 at 9:00 AM PDT. Last updated Fri Apr 25 at 9:10 AM PDT. (DBC-73987) |
Highway 13 Southbound |
Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478) |
Highway 17 Westbound |
Highway 17, westbound. Night time construction work between Bridgeview Dr and Tannery Rd for 3.3 km (Surrey). Until Mon Apr 28 at 5:00 AM PDT. Road closed. Detour via Bridgeview Dr to Scott Rd to Tannery Rd. Next update time Mon Apr 28 at 5:00 AM PDT. Last updated Sun Apr 27 at 2:00 PM PDT. (DBC-75805) |
Highway 99 Both Directions |
Highway 99, in both directions. Road construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Tue May 6 until Sun May 11. Road closure planned. Watch for traffic control personnel. Detour planned. Work will take place on May 6, 7 and 11 from 11:00pm until 4:30am. Use the Steveston Highway ramps. Next update time Thu May 8 at 9:00 AM PDT. Last updated Fri Apr 25 at 5:56 PM PDT. (DBC-75825) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 8: Cypress Bowl Rd and Exit 10: 21st St for 2.1 km (West Vancouver). Starting Wed Apr 30 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. Shoulder will be closed. EB shoulder closure at 26th St pedestrian overpass & at Exit 8. Prepare to slow down. Last updated Wed Apr 16 at 6:24 PM PDT. (DBC-75485) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Keith Rd and Exit 14: Capilano Rd (North Vancouver - District). Starting Thu May 1 at 10:00 PM PDT until Fri May 2 at 5:00 AM PDT. Lane closures in both directions planned. Last updated Fri Apr 25 at 11:43 AM PDT. (DBC-75802) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Edgemont Blvd and Mosquito Creek Bridge for 0.1 km (North Vancouver - District). Starting Wed Apr 30 at 10:00 PM PDT until Thu May 1 at 5:00 AM PDT. Left lane will be closed in both directions. Last updated Fri Apr 25 at 11:42 AM PDT. (DBC-75800) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy (North Vancouver - City). Starting Tue Apr 29 at 10:00 PM PDT until Wed Apr 30 at 5:00 AM PDT. Lane closures in both directions planned. Last updated Fri Apr 25 at 11:40 AM PDT. (DBC-75798) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Exit 21: Mountain Hwy and Exit 22: Lillooet Rd for 0.1 km (North Vancouver - District). Until Mon Apr 28 at 5:00 AM PDT. Lane closures in both directions in effect. Last updated Fri Apr 25 at 11:41 AM PDT. (DBC-75797) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work planned between Exit 37: Gaglardi Way and Exit 40: Brunette Ave for 3.2 km (Burnaby to Coquitlam). Starting Fri May 2 at 9:30 PM PDT until Sat May 3 at 7:00 AM PDT. Roadway will be reduced to one lane. Loading of material to and from the Millennium Line. Last updated Wed Apr 23 at 2:22 PM PDT. (DBC-75677) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Left lane is closed in both directions. Last updated Fri Mar 21 at 1:14 PM PDT. (DBC-74277) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between 216th St and Exit 73 for 11.4 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 5:00 AM PDT daily. Lane closures in both directions in effect. Last updated Tue Apr 1 at 8:54 AM PDT. (DBC-74725) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between 216th St and Exit 73 for 11.4 km (Langley - District). Until Sun May 11. From 8:30 PM to 10:30 AM PDT on weekends. Lane Closure. Watch for traffic control. Scheduled overnight construction work. April 26/27, May 2/3, May 3/4, May 9/10 and May 10/11. Last updated Wed Apr 2 at 4:24 PM PDT. (DBC-74816) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance between Bradner Rd and 248 St for 7.2 km (Abbotsford to Langley - District). Until Wed Apr 30 at 5:00 AM PDT. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Lane Closure. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74743) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance between 248 St and Bradner Rd for 9.4 km (Langley - District to Abbotsford). Until Wed Apr 30 at 5:30 AM PDT. From 9:00 PM to 7:30 AM PDT on weekends and from 9:00 PM to 5:30 AM PDT on weekdays. Lane Closure. Last updated Tue Apr 1 at 4:29 PM PDT. (DBC-74749) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work between Exit 170 and Water Ave for 2.3 km (Hope). Until Mon Apr 28. From 8:00 AM to 4:00 PM PDT on weekdays. Shoulder closed. Left turn lane closed. Left hand turn lane to Water Ave closed. Left turn accessible via right lane. Last updated Thu Apr 17 at 12:45 PM PDT. (DBC-74932) |
Highway 1 |
Highway 1 (TransCanada Highway). Special event between Old Boston Bar Rd and North Bend Ferry Rd for 1.1 km (26 to 27 km south of Jackass Mountain Summit). Until Tue Apr 29 at 4:00 PM PDT. Single lane alternating traffic. Last updated Thu Apr 17 at 12:52 PM PDT. (DBC-75520) |
Highway 10 Westbound |
Highway 10, westbound. Construction work between 152 St and Panorama Dr for 0.4 km (Surrey). Until Wed Apr 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Right turn lane closed. Shoulder closed. Sidewalk restoration. Watch for traffic control. Last updated Mon Apr 21 at 12:08 PM PDT. (DBC-75533) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278) |
Highway 101 Both Directions |
Highway 101, in both directions. Utility work between Donley Dr and Sans Souci Rd for 4.9 km (11 to 16 km west of Sechelt). Until Fri May 2 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Last updated Thu Apr 24 at 1:43 PM PDT. (DBC-75746) |
Highway 101 Westbound |
Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-72411) |
Highway 11 Both Directions |
Highway 11, in both directions. Industrial traffic may slow or block regular traffic. Between McClary Ave and Delair Rd (Abbotsford). Until Thu May 8. From 7:00 PM to 6:00 AM PDT on weekends. Watch for traffic control. Construction vehicles will be travelling along the shoulder. No lane closures are planned. Next update time Thu May 8 at 6:00 PM PDT. Last updated Thu Apr 10 at 1:35 PM PDT. (DBC-73478) |
Highway 11 |
Highway 11. Bridge construction between Riverside St and Cedar Valley Conn for 3.2 km (Mission to Abbotsford). Until Fri May 9. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays and Sunday. Lane Closure. NB work until May 3: 1 lane closed. Width restriction 3.8m. Loads over 3.8m may not cross until 4:30AM, supervised with 7 days notice. Speed bumps 24hrs/day. Last updated Sat Apr 12 at 1:47 AM PDT. (DBC-74538) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Mon Apr 21 at 12:10 PM PDT. (DBC-74197) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work between 32 Ave and 40 Ave for 1.6 km (Surrey). Until Mon May 12 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Last updated Mon Apr 21 at 12:15 PM PDT. (DBC-73932) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 21 at 12:17 PM PDT. (DBC-75355) |
Highway 17 Eastbound |
Highway 17, eastbound. Road sweeping at 104 Ave (Surrey). Until Mon Apr 28 at 4:00 AM PDT. Roadway reduced to one lane. Last updated Sun Apr 27 at 8:56 PM PDT. (DBC-75866) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Utility work planned between Sunshine Valley and Allison Pass Summit for 9.7 km (21 to 31 km east of Hope). Starting Tue May 6 until Fri May 16. From 9:00 AM to 4:00 PM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri Apr 25 at 9:13 AM PDT. (DBC-75788) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724) |
Highway 3 |
Highway 3 (Crowsnest Highway). Utility work between Allison Pass Summit and Manning Park Resort (58 km east of Hope). Until Thu May 15 at 4:30 PM PDT. Lane Closure. Hydro Pole replacement from Gibson Pass Rd. To Manning Park. Last updated Tue Apr 15 at 2:51 PM PDT. (DBC-75425) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Construction work planned between Laity St and 216 St for 0.4 km (Maple Ridge). Starting Tue Apr 29 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday and Wednesday. Right lane will be closed. Shoulder will be closed. Last updated Fri Apr 11 at 11:33 AM PDT. (DBC-75275) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Work days April 28-May 3. WB right turn to 272nd St closed. Detour at 263rd St. Construction speed limit 50km/hr. River Rd single lane alternating traffic as needed. Next update time Sat May 3 at 5:00 PM PDT. Last updated Sat Apr 26 at 6:01 PM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.0 km (2 to 4 km east of Mission). Until Wed Apr 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Watch for traffic control. Last updated Mon Apr 21 at 12:36 PM PDT. (DBC-74678) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Until Wed Apr 30 at 3:00 PM PDT. Watch for traffic control. Last updated Fri Mar 28 at 4:12 PM PDT. (DBC-74614) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Roadside brushing planned between Cameron Rd and Bodnar Rd for 1.6 km (Kent). Starting Mon Apr 28 at 7:00 AM PDT until Fri May 2 at 2:00 PM PDT. From 7:00 AM to 2:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Last updated Sun Apr 27 at 5:37 PM PDT. (DBC-75859) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Utility work between Wilson Rd and Key Rd for 0.4 km (Kent). Until Fri May 2. From 9:00 AM to 3:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Wed Apr 23 at 2:47 PM PDT. (DBC-75679) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Bridge maintenance between Seabird Island Rd and Ruby Creek Rd for 15.0 km (Kent). Lane Closure. Watch for traffic control. Last updated Tue Mar 25 at 7:23 AM PDT. (DBC-74408) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work planned between Ross Rd and Chawathil Rd for 6.3 km (Hope). Starting Wed Apr 30 at 9:00 AM PDT until Wed May 7 at 3:00 PM PDT. Right lane will be blocked. Work is between Chawathil Rd. And Haig Scale. BC Hydro Utility work. Speed reduction to 50 km/hr. Last updated Wed Apr 23 at 2:53 PM PDT. (DBC-75680) |
Highway 7B Eastbound |
Highway 7B (Mary Hill Bypass), eastbound. Construction work between Broadway St and Kingsway Ave for 1.2 km (Port Coquitlam). Until Mon May 12 at 2:00 PM PST. From 6:00 AM to 2:00 PM PST daily. Right lane closed. Bus stop improvement project. Last updated Thu Jan 9 at 12:17 PM PST. (DBC-70617) |
Highway 9 |
Highway 9. Mowing between Hot Springs Road and Whelpton Road. Until Wed Apr 30. From 7:00 AM to 2:00 PM PDT on Monday, Tuesday and Wednesday. Watch for mower and slow moving vehicle. Last updated Sun Apr 27 at 6:31 PM PDT. (DBC-75862) |
Highway 91 Southbound |
Highway 91, southbound. Bridge maintenance at Alex Fraser Bridge (Delta). Until Wed Apr 30. From 10:00 PM to 4:30 AM PDT on Sunday, Monday, Tuesday and Wednesday. Right lane closed. Centre lane closed. Watch for traffic control. Last updated Fri Apr 25 at 2:31 PM PDT. (DBC-75816) |
Highway 99 Southbound |
Highway 99, southbound. Ditching between 72 St and Exit 20 for 0.3 km (Delta). Until Fri May 2. From 6:30 AM to 3:00 PM PDT on weekdays. Exit ramp is closed. Detour in effect. Exit 23: 80 St will be closed. Detour available via Exit 20. Closure in place on weekends as needed. Last updated Sat Apr 26 at 8:16 AM PDT. (DBC-74159) |
Highway 99 Southbound |
Highway 99, southbound. Road construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Mon May 12 until Thu May 15. From 10:00 PM to 5:30 AM PDT on Monday, Tuesday, Wednesday and Thursday. Right turn lane will be closed. Watch for traffic control personnel. Next update time Thu May 15 at 9:00 AM PDT. Last updated Fri Apr 25 at 5:28 PM PDT. (DBC-75821) |
Highway 99 |
Highway 99. Road construction work planned at Exit 32: Steveston Hwy (Richmond). Starting Sun May 4 until Wed May 7 at 7:00 AM PDT. From 8:00 PM to 7:00 AM PDT on Sunday, Monday, Tuesday and Wednesday. Eastbound traffic on Steveston Highway approaching Highway 99 will have a double right lane closure. Watch for traffic control personnel. Last updated Fri Apr 25 at 5:26 PM PDT. (DBC-75822) |
Highway 99 Southbound |
Highway 99, southbound. Bridge maintenance at Oak Street Bridge (Vancouver). Until Mon Apr 28 at 5:00 AM PDT. Right lane closed. Watch for traffic control. Last updated Fri Apr 25 at 8:14 AM PDT. (DBC-75781) |
Highway 99 Both Directions |
Highway 99, in both directions. Bridge maintenance between Exit 3: Horseshoe Bay Junction and Lions Bay Ave for 12.0 km (West Vancouver to Lions Bay). Until Fri May 2. From 7:30 AM to 5:30 PM PDT daily. Lane Closure. Watch for traffic control. Last updated Fri Apr 25 at 9:25 AM PDT. (DBC-75793) |
Highway 99 Both Directions |
Highway 99, in both directions. Roadside brushing between Scott Cres and Alpha Lake Rd for 50.6 km (Squamish to Whistler). Until Fri May 2. From 7:30 AM to 5:30 PM PDT daily. Slow moving vehicle operations. Expect minor delays. Last updated Fri Apr 25 at 9:26 AM PDT. (DBC-75794) |
Highway 99 Northbound |
Highway 99, northbound. Electrical maintenance between Scott Cres and Cleveland Ave (Squamish). Until Fri May 2. Right turn lane closed. Shoulder closed. Next update time Fri May 2 at 6:00 AM PDT. Last updated Fri Mar 28 at 1:34 PM PDT. (DBC-74602) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned between Scott Cres and Cleveland Ave (Squamish). Starting Fri May 2 until Fri May 16 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays. Right turn lane will be closed. Shoulder will be closed. Work to end by 12 PM on Fridays. Pedestrian detour available. Last updated Fri Mar 28 at 1:39 PM PDT. (DBC-74601) |
Highway 99 Both Directions |
Highway 99, in both directions. Special event planned between Nairn Falls Park Rd and E Lillooet Rd for 103.9 km (Pemberton to Lillooet). Starting Tue Apr 29 at 9:00 AM PDT until Tue Apr 29 at 4:00 PM PDT. Lane Closure. Filming. Expect delays up to 5 minutes. Last updated Sat Apr 26 at 2:25 PM PDT. (DBC-75838) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Other Roads Eastbound |
Dollarton Highway, eastbound. Utility work between Highway 1 and Dollarton Bridge in North Vancouver - City. Until Wed Apr 30 at 8:00 PM PDT. From 7:00 AM to 8:00 PM PDT daily. Shoulder closed. Watch for traffic control. Last updated Mon Apr 21 at 12:50 PM PDT. (DBC-72344) |
Other Roads Both Directions |
Othello Road, in both directions. Construction work between Tunnels Road and Highway 5 (Exit 183). Until Fri May 2. From 6:00 AM to 7:00 PM PDT daily. Expect delays. Othello Road MoTT Project. Last updated Thu Mar 20 at 3:18 PM PDT. (DBC-74227) |
Other Roads Both Directions |
56th Ave, in both directions. Night time construction work between 256th St and Gloucester Way. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74742) |
Other Roads Both Directions |
264th Street, in both directions. Night time construction work between 48 Ave and 58 Ave. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:22 PM PDT. (DBC-74747) |
Other Roads Eastbound |
Mountain Hwy, eastbound. Utility work planned between Highway 1 and Arborlynn Dr. Starting Tue Apr 29 at 9:00 AM PDT until Tue Apr 29 at 3:00 PM PDT. Last updated Thu Apr 3 at 5:44 PM PDT. (DBC-74892) |
Other Roads Westbound |
NW Marine Drive, westbound. Maintenance between 4900 Block and Spanish Banks West Parking Lot A in Vancouver. Until Fri May 2 at 3:00 PM PDT. From 7:00 AM to 3:00 PM PDT on weekdays. Watch for traffic control. Last updated Mon Apr 21 at 12:48 PM PDT. (DBC-75235) |
Other Roads Both Directions |
Marine Dr, in both directions. Maintenance planned between Acadia Rd and Acadia Beach Parking Lot. Starting Thu May 1 at 7:00 AM PDT until Thu May 1 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Apr 24 at 3:05 PM PDT. (DBC-75753) |
Other Roads Westbound |
University Blvd, westbound. Geotechnical investigation between Blanca St and Wesbrook Mall 1 km north of Vancouver. Until Fri Jun 6. From 7:30 AM to 7:00 PM PDT daily. Left shoulder closed. Geotechnical investigation on median. Watch for traffic control. Last updated Fri Apr 25 at 11:42 AM PDT. (DBC-75801) |
Other Roads Southbound |
Bradner Rd, southbound. Utility work between Downes Rd and Highway 1 in Abbotsford. Until Sat May 31. From 7:00 AM to 5:00 PM PDT daily. Work taking place underneath Highway 1 from Downes Rd to Downes Rd on Bradner. Last updated Fri Apr 25 at 1:23 PM PDT. (DBC-75811) |
Other Roads Both Directions |
Cypress Bowl Road, in both directions. Road maintenance work between Uplands Way and Cypress Place 1 km north of West Vancouver. Until Sat May 31. From 7:30 AM to 4:00 PM PDT on weekdays. Expect minor delays. Last updated Fri Apr 25 at 4:47 PM PDT. (DBC-75820) |