-
Lower Mainland / Highway 11
-
Highway 11. Bridge construction between Riverside St and Cedar Valley Conn for 3.2 km (Mission to Abbotsford). Until Fri May 9. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays and Sunday. Lane Closure. NB work until May 3: 1 lane closed. Width restriction 3.8m. Loads over 3.8m may not cross until 4:30AM, supervised with 7 days notice. Speed bumps 24hrs/day. Last updated Sat Apr 12 at 1:47 AM PDT. (DBC-74538)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Tonight Mon Abbotsford 8 14 Chilliwack 8 14 Pitt Meadows 8 12 White Rock 8 13 Agassiz 8 14 Vancouver 8 13 Source: Environment Canada