-
West Kootenay / Highway 33 Both Directions
-
Highway 33, in both directions. Paving operations planned between Kettle Valley Rail Trail and Beaverdell Station Rd for 34.7 km (Beaverdell to Westbridge). Starting Wed Apr 30 until Fri Jul 11. From 6:30 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Watch for uneven pavement and milled surfaces. No work on long weekends. Last updated Thu Apr 24 at 12:47 PM PDT. (DBC-75739)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Tonight Mon Rock Creek 3 23 Osoyoos 6 21 Penticton 6 21 Grand Forks 3 23 Summerland 6 21 Kelowna 7 18 Source: Environment Canada