-
Okanagan-Shuswap / Highway 1 Both Directions
-
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h 24/7 until May 12. Watch for traffic control. Next update time Mon May 12 at 5:00 PM PDT. Last updated Sat Apr 26 at 2:13 PM PDT. (DBC-64961)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Tonight Mon Salmon Arm 4 19 Kamloops 7 21 Vernon 7 18 Coquihalla Highway - Merritt to Kamloops - - Clearwater 4 19 Kelowna 7 18 Source: Environment Canada