Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting planned between Griffin Lake Avalanche Gate and Clanwilliam OH Bridge for 15.4 km (9 to 24 km west of Revelstoke). Starting Thu May 1 at 10:00 AM PDT until Thu May 1 at 12:00 PM PDT. Road closure planned. Next update time Thu May 1 at 12:00 PM PDT. Last updated Thu Apr 17 at 4:40 PM PDT. (DBC-75539) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Until Wed May 14. Travelers should expect traffic delays up to 30 min 24 hours a day with single lane alternating traffic or closures. Next update time Thu May 15 at 12:00 PM PDT. Last updated Thu Apr 17 at 12:29 PM PDT. (DBC-73974) |
Upper Arrow Lake Ferry Both Directions |
Upper Arrow Lake Ferry, in both directions. Crewing issue are expected at Upper Arrow Lake Ferry (Upper Arrow Lake). Starting Mon Apr 28 at 11:00 PM PDT until Tue Apr 29 at 5:00 AM PDT. Ferry will be out of service. The last sailings will be at 10pm from Shelter Bay and 1030pm from Galena Bay. Next update time Tue Apr 29 at 5:00 AM PDT. Last updated Sun Apr 27 at 6:33 PM PDT. (DBC-75863) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (18 to 16 km west of Revelstoke). Until Sun May 18 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of 20 mins. Last updated Mon Apr 21 at 12:04 PM PDT. (DBC-74730) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Woods OH Bridge and Boulder Mtn Avalanche Gate for 4.2 km (8 to 12 km west of Revelstoke). Starting Wed May 7 until Sun Aug 31. From 7:00 PM to 7:00 AM PDT daily. Speed reduction to 30km/h during construction. Last updated Fri Apr 25 at 5:56 PM PDT. (DBC-75826) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Oak Dr and Quartz Creek Bridge (Structure) for 100.3 km (Revelstoke to 14 km east of East Boundary of Glacier National Park). There is debris on the road. Last updated Mon Apr 28 at 2:04 AM PDT. (DBC-74959) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Greely Rd and Skunk Cabbage Boardwalk for 16.1 km (4 km west of East Boundary of Mount Revelstoke National Park to 4 km east of Revelstoke). Starting Tue Apr 29 at 8:00 AM PDT until Wed Apr 30 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on Tuesday and Wednesday. Shoulder maintenance planned. Speed reduction to 70Km/h and expect occasional traffic stoppages. Last updated Thu Apr 24 at 1:03 PM PDT. (DBC-75743) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Giant Cedars Boardwalk and Albert Canyon Chain Up Area for 0.4 km (East Boundary of Mount Revelstoke National Park). Starting Mon Apr 28 at 8:00 AM PDT until Mon Apr 28 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Bridge washing on Woosley Creek Bridge. Last updated Sun Apr 27 at 12:04 PM PDT. (DBC-75849) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Last updated Fri Apr 4 at 9:52 AM MDT. (DBC-73964) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave Rest Area and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Mon Oct 27. From 7:00 AM to 7:00 PM MDT daily. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Tue Jul 15 at 12:00 PM MDT. Last updated Tue Apr 15 at 9:05 PM MDT. (DBC-75437) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road maintenance work planned between Hartley Rd and 14th St N for 8.4 km (Golden). Starting Mon Apr 28 at 9:00 AM MDT until Fri May 2 at 6:00 PM MDT. From 9:00 AM to 6:00 PM MDT on weekdays. Crack sealing is planned. Single lane alternating traffic will be in effect. Last updated Fri Apr 25 at 4:13 PM MDT. (DBC-75817) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Debris on roadway. Last updated Mon Apr 28 at 3:04 AM MDT. (DBC-44269) |
Highway 23 Both Directions |
Highway 23, in both directions. Watch for falling rocks between Revelstoke Dam Avalanche Gates and Mica Dam for 146.6 km (Revelstoke to 5 km north of Mica Dam). Debris on roadway. Last updated Mon Apr 28 at 2:04 AM PDT. (DBC-74960) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road sweeping between Jim Smith Lake Rd and 30th Ave N for 5.7 km (Cranbrook). Until Mon May 5 at 3:30 PM MDT. From 8:00 AM to 3:30 PM MDT daily. Lane closures in both directions in effect. Intermittent closures will take place as crews work. One lane in both directions will be maintained. Last updated Mon Apr 21 at 1:33 PM MDT. (DBC-73673) |
Highway 93 Both Directions |
Highway 93, in both directions. Bridge maintenance planned between Dorr Cut-off Rd and Fitzpatrick Rd for 4.7 km (8 to 12 km north of Grasmere). Starting Tue May 13 at 9:00 AM MDT until Tue May 13 at 5:00 PM MDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Speed reduction to 50 km/hour. Last updated Thu Apr 24 at 8:59 AM MDT. (DBC-75712) |
Highway 93 Both Directions |
Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Thu Jul 10 at 7:00 PM MDT. From 7:00 AM to 7:00 PM MDT on weekdays and Saturday. Watch for traffic control. Expect delays. Speed reduced to 50km/h. Single lane alternating traffic in effect April 28, 2025 to May 3, 2025. Last updated Sat Apr 26 at 1:07 PM MDT. (DBC-73931) |
Highway 95A Both Directions |
Highway 95A, in both directions. Utility work planned between St. Marys Ave and Jennings Ave for 0.1 km (Kimberley). Starting Thu May 1 until Fri May 2. From 7:00 AM to 6:00 PM MDT on Thursday and Friday. Southbound lane will be closed. Single lane alternating traffic will be in effect. Watch for traffic control. Last updated Fri Apr 25 at 2:06 PM MDT. (DBC-75790) |
Highway 95A Southbound |
Highway 95A, southbound. Maintenance between Torrent Rd and Elk Dr for 3.6 km (23 to 26 km north of Kimberley). Until Wed Apr 30 at 5:00 PM MDT. From 9:00 AM to 5:00 PM MDT daily. Last updated Mon Apr 21 at 1:38 PM MDT. (DBC-75461) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712) |
Upper Arrow Lake Ferry Both Directions |
Upper Arrow Lake Ferry, in both directions. There will be possible ferry delays between Galena Bay and Shelter Bay. Starting Thu May 1 until Fri May 2. Expect possible delays due to safety inspections. Last updated Thu Apr 24 at 8:05 AM PDT. (DBC-75713) |