Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Construction work planned between Laity St and 216 St for 0.4 km (Maple Ridge). Starting Tue Apr 29 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday and Wednesday. Right lane will be closed. Shoulder will be closed. Last updated Fri Apr 11 at 11:33 AM PDT. (DBC-75275) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Work days April 28-May 3. WB right turn to 272nd St closed. Detour at 263rd St. Construction speed limit 50km/hr. River Rd single lane alternating traffic as needed. Next update time Sat May 3 at 5:00 PM PDT. Last updated Sat Apr 26 at 6:01 PM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.1 km (2 to 4 km east of Mission). Until Sat May 31. From 7:00 PM to 6:00 AM PDT daily. Watch for traffic control. Last updated Thu Apr 24 at 7:52 AM PDT. (DBC-75710) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.0 km (2 to 4 km east of Mission). Until Wed Apr 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on weekdays. Watch for traffic control. Last updated Mon Apr 21 at 12:36 PM PDT. (DBC-74678) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Until Wed Apr 30 at 3:00 PM PDT. Watch for traffic control. Last updated Fri Mar 28 at 4:12 PM PDT. (DBC-74614) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Roadside brushing planned between Cameron Rd and Bodnar Rd for 1.6 km (Kent). Starting Mon Apr 28 at 7:00 AM PDT until Fri May 2 at 2:00 PM PDT. From 7:00 AM to 2:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Last updated Sun Apr 27 at 5:37 PM PDT. (DBC-75859) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Utility work between Wilson Rd and Key Rd for 0.4 km (Kent). Until Fri May 2. From 9:00 AM to 3:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Wed Apr 23 at 2:47 PM PDT. (DBC-75679) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Bridge maintenance between Seabird Island Rd and Ruby Creek Rd for 15.0 km (Kent). Lane Closure. Watch for traffic control. Last updated Tue Mar 25 at 7:23 AM PDT. (DBC-74408) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Utility work planned between Ross Rd and Chawathil Rd for 6.3 km (Hope). Starting Wed Apr 30 at 9:00 AM PDT until Wed May 7 at 3:00 PM PDT. Right lane will be blocked. Work is between Chawathil Rd. And Haig Scale. BC Hydro Utility work. Speed reduction to 50 km/hr. Last updated Wed Apr 23 at 2:53 PM PDT. (DBC-75680) |