Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Electrical maintenance planned between Stella Rd and Manitoba St for 8.0 km (Endako). Starting Wed Apr 30 at 8:00 AM PDT until Wed Apr 30 at 4:00 PM PDT. Right lane will be blocked. Last updated Fri Apr 25 at 11:41 AM PDT. (DBC-75799) |
Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Utility work planned between Myers Pit Rd and Fraser Mountain Rd for 2.5 km (6 to 3 km west of Fort Fraser). Starting Mon Apr 28 at 8:00 AM PDT until Mon Apr 28 at 6:00 PM PDT. Right lane will be blocked. Speed reduction to 60km/hr. Watch for traffic control. Last updated Wed Apr 23 at 3:01 PM PDT. (DBC-75456) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Industrial traffic may slow or block regular traffic. Between Dome Creek Rd and Carmel Dr for 137.9 km (2 km west of Prince George to 53 km east of Purden Lake). Until Mon Apr 28 at 5:00 AM PDT. Watch for traffic control. Last updated Sun Apr 27 at 6:29 AM PDT. (DBC-75844) |
Highway 27 Both Directions |
Highway 27, in both directions. Utility work between Blue Mountain Rd and Riverbank Rd for 26.8 km (5 to 32 km south of Fort St James). Until Wed Apr 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Apr 16 at 8:42 AM PDT. (DBC-75455) |
Highway 27 Both Directions |
Highway 27, in both directions. Utility work planned at Riverbank Rd (5 km south of Fort St James). Starting Tue Apr 29 at 8:00 AM PDT until Wed Apr 30 at 6:00 PM PDT. Right lane will be closed in both directions. Work is between riverbank Rd. And Clearview Landfill. BC Hydro Utility Work. Speed reduction to 60 km/h. Last updated Wed Apr 23 at 3:01 PM PDT. (DBC-75681) |
Highway 97 |
Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Last updated Fri Dec 27 at 8:11 AM PST. (DBC-71474) |
Highway 97 Southbound |
Highway 97, southbound. Utility work planned between North Nechako Rd and 5th Ave for 0.6 km (Prince George). Starting Mon Apr 28 at 9:00 AM PDT until Tue Apr 29 at 3:00 PM PDT. Left lane will be closed. Last updated Mon Apr 14 at 3:49 PM PDT. (DBC-75374) |
Highway 97 |
Highway 97. Road sweeping between Chief Lake Rd and Kloss Rd for 142.1 km (Prince George to 16 km north of McLeod Lake). From 7:00 AM to 5:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Shoulder closed. Last updated Mon Apr 7 at 6:46 AM PDT. (DBC-74987) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426) |
Highway 97 Southbound |
Highway 97, southbound. Special event planned between Carp Lake Rd and Haight Rd for 6.0 km (McLeod Lake). Starting Wed Aug 6 at 9:00 AM PDT until Wed Aug 6 at 12:00 PM PDT. Lane Closure. Watch for traffic control personnel. Single lane alternating traffic will be in effect. Last updated Thu Apr 10 at 2:54 PM PDT. (DBC-75226) |
Other Roads Southbound |
Endako Mine Road, southbound. Electrical maintenance planned between Highway 16 and Glenannan Road near Endako. Starting Wed Apr 30 at 8:00 AM PDT until Wed Apr 30 at 4:00 PM PDT. Right lane will be blocked. Last updated Fri Apr 25 at 11:45 AM PDT. (DBC-75803) |